What this work involves
Check flatness, moisture and available height. Flooring affects doors, skirting, stairs and heating. Coordinate these junctions before ordering.
- Substrate and preparation
- Heights and transitions
- Material and use
- Underfloor heating coordination
- Skirting, thresholds and maintenance
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Assess floor, cupboard, wall and ceiling through their shared junctions.
What the drawing needs to explain
Draw one bespoke junction at a large scale with every adjoining finish layer. Identify who takes final dimensions and which substrate must be ready for that measurement.
How to review the result
Use the approved sample as a reference and assess junctions under the agreed lighting. Check operation and maintenance access as well as the visible finish.
Cost factors for this service
Removal, repairs, levelling, material and details determine the total.
Bring this to the discussion
Photographs, known floor construction and measurements at doors and transitions.
Questions about the work
Can a new floor go over the existing one?
It depends on stability, moisture, adhesion, height and system requirements. Have the substrate assessed first.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

