What this work involves
Start with a final kitchen installation drawing. Then establish which walls, floors and connections change. This avoids furniture that does not fit or inaccessible services.
- Removal of the existing kitchen
- Layout and wall changes
- Water, drainage, electrics and ventilation
- Floor and wall finishes
- Measuring, delivery and installation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Include adequate bespoke measurement stages in the renovation plan.
Decide this before construction
Approve material combinations and the sample detail before production. Complete work affecting dimensions before ordering final bespoke components.
Which trade-off matters?
A minimal joint or concealed fixing may need extra coordination. Compare the intended appearance with tolerances, maintenance and replaceability before treating a detail as straightforward.
Compare the complete intervention
Identify samples, measurement and coordination separately in the budget. Craftsmanship involves preparation and accurately fitted transitions as well as the material itself.
Cost factors for this service
Building preparation is often separate from the kitchen price. Include service changes and repairs to adjacent surfaces.
Bring this to the discussion
Kitchen design, installation drawing, dimensions and photographs.
Questions about the work
When should the kitchen be measured?
Agree this with the supplier. After building changes, final measuring may need to wait until the relevant dimensions are reliable.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.