What this work involves
Define the functions you need. Drainage, water, ventilation and electrical positions influence the layout. Coordinate niches, lighting and tile sizes before work starts.
- Layout and access to fittings
- Substrate and waterproof connections
- Drainage, water and ventilation
- Safe electrical arrangements
- Tiles, joints, sealants and maintenance
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Include adequate bespoke measurement stages in the renovation plan.
Decide this before construction
Approve material combinations and the sample detail before production. Complete work affecting dimensions before ordering final bespoke components.
Which trade-off matters?
A minimal joint or concealed fixing may need extra coordination. Compare the intended appearance with tolerances, maintenance and replaceability before treating a detail as straightforward.
Compare the complete intervention
Identify samples, measurement and coordination separately in the budget. Craftsmanship involves preparation and accurately fitted transitions as well as the material itself.
Cost factors for this service
Moving pipework, repairing the substrate and selecting fittings and tiles affect the price. Include demolition waste and finishing outside the room where necessary.
Bring this to the discussion
Dimensions, photographs, existing layout and examples of preferred fittings and finishes.
Questions about the work
Can bathroom fittings go anywhere?
Not automatically. Drainage, floor construction and pipe routes must be suitable. Have the layout assessed before ordering products.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

